[1]
2024. Substantiation of the Split Phase Construction of the Overhead Intersystem Power Transmission Lines . Visnyk of Vinnytsia Politechnical Institute. 6 (Dec. 2024), 27–33. DOI:https://doi.org/10.31649/1997-9266-2024-177-6-27-33.