“Substantiation of the Split Phase Construction of the Overhead Intersystem Power Transmission Lines ”. 2024. Visnyk of Vinnytsia Politechnical Institute, no. 6 (December): 27–33. https://doi.org/10.31649/1997-9266-2024-177-6-27-33.