[1]
“Substantiation of the Split Phase Construction of the Overhead Intersystem Power Transmission Lines ”, Вісник ВПІ, no. 6, pp. 27–33, Dec. 2024, doi: 10.31649/1997-9266-2024-177-6-27-33.