1.
OPTIMAL CONNECTION OF SINGLE-PHASE LOADS WITH CHANGING IN TIME PARAMETERS, TO KNOT OF THREE-WIRE ELECTRIC NETWORK. Вісник ВПІ [Internet]. 2017 Mar. 23 [cited 2026 Oct. 10];(1):57-61. Available from: https://visnyk.vntu.edu.ua/index.php/visnyk/article/view/2011