Energy generation and electrical engineering

PROBLEMS THAT NEED A SOLUTION WHILE USING ASYNCHRONOUS GENERATOR OF RENEWABLE ENERGY IN POWER PLANTS

Authors

O. B. Mykhailiuk
Vinnytsia National Technical University ROR

Keywords

asynchronous generator voltage reactive power capacitor installation

Abstract

There has been completed the overview of the literature relating to methods of regulating voltage asynchronous generator. The main disadvantages of existing systems have been defined and the main tasks that need to be solved in carrying out studies related to the use of asynchronous generators in power plants in renewable energy have been formed.

352 322

How to Cite

[1]
“PROBLEMS THAT NEED A SOLUTION WHILE USING ASYNCHRONOUS GENERATOR OF RENEWABLE ENERGY IN POWER PLANTS”, Вісник ВПІ, no. 1, pp. 96–100, Mar. 2016, Accessed: Oct. 06, 2026. Available: https://visnyk.vntu.edu.ua/index.php/visnyk/article/view/1883

Author Biography

O. B. Mykhailiuk, Vinnytsia National Technical University
Post-Graduate Student of the Chair of Renewable Energy and Transportation Systems and Electrical Systems

Most read articles by the same author(s)