OPTIMAL CONNECTION OF SINGLE-PHASE LOADS WITH CHANGING IN TIME PARAMETERS, TO KNOT OF THREE-WIRE ELECTRIC NETWORK
Keywords
Abstract
There have been developed the algorithm calculating the optimal connection of single-phase loads to the knot of three-wire electric network taking into account the changes in their parameters in time.
