Load balancing of electric nodes using two-phase symmetring installations in electrical networks
Keywords:
symmetry of loadings, two phase balancing installationsAbstract
In the case of the possibility of incomplete balancing of loadings it is expedient to use two-phase balancing installation, as they provide the minimal economic charges at admissible value of asymmetry factor of the voltage in a reverse sequence. The conditions of balancing of loadings are obtained, presented as active conductivity of reverse sequence in systems of coordinates relatively phases A, B and C, that provides an opportunity of essential reduction of errors due to the identity of construction of measuring channels of two phase balancing installations.Downloads
-
PDF (Українська)
Downloads: 46
Abstract views: 168
Published
2010-11-12
How to Cite
[1]
M. Y. Burbelo, M. V. Kuzmenko, O. O. Biriukov, and O. M. Kinzerska, “Load balancing of electric nodes using two-phase symmetring installations in electrical networks”, Вісник ВПІ, no. 5, pp. 35–38, Nov. 2010.
Issue
Section
Energy generation and electrical engineering
License
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgment of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).